⎝⎛中国足彩app⎞⎠

Hello! Welcome to the website of Dongguan Lixiang Air Conditioning Purification Engineering Co., Ltd.!
share it

Project Category

Main project classification

Installation and use method of Dongguan clean room


Selection and layout of air filters for different levels of air cleanliness in dust-free workshops: For 300,000 air purification treatment, sub-high efficiency filters can be used instead of high efficiency filters; air cleanliness 100, 10,000 and 100,000 For treatment, three levels of primary, intermediate and high-efficiency filters should be used; medium-efficiency or high-efficiency air filters should be selected based on less than or equal to the rated air volume; medium-efficiency air filters should be concentrated in the positive pressure section of purified air conditioning; Or sub-high efficiency air filters should be installed at the end of the purified air conditioning system.

1. All maintenance components of the assembled clean workshop are processed in the factory according to a unified modulus and series, which is suitable for mass production, stable quality and rapid supply;

2. Flexible and flexible, which is suitable for supporting installation in newly-built factory buildings, and also suitable for purification technology transformation of old factory buildings. The maintenance structure can also be arbitrarily combined with the process requirements, and it is easy to disassemble;

3. The area of auxiliary buildings is small, and the requirements for earth building decoration are low;

Business Consulting
WeChat public account
Mobile app

⎝⎛中国足彩app⎞⎠