Hello! Welcome to the website of Dongguan Lixiang Air Conditioning Purification Engineering Co., Ltd.!
share it

Project Category

Main project classification

Equipment Management of Dongguan Purification Project



1. A person from the Dongguan Purification Engineering Equipment Department checks the air-conditioning display data on the control board every day and checks the operation of the air-conditioning system every week.

2. The person in the equipment department does the maintenance work. Establish a maintenance log.

3. The laminar flow should be turned on at least 1 h before the experiment to maintain the low-speed operation. The high-speed operation should be adjusted 30 to 40 minutes before the experiment.

4. Dongguan purification project has not been used in the laboratory for a long time, when it should be activated, the air supply filter should be cleaned, and start at least 3 hours in advance.

5. According to the seasonal change, adjust the appropriate temperature and humidity accordingly.

6. Do a good job of safety management of laminar flow laboratory. Personnel should be familiar with the use of fire equipment and the location of safe passages.

7. Do not use the outdoor unit in winter or for a long time. In winter, when the unit is not running temporarily and running without heating, the water in the coil (system) must be drained, otherwise the coil will freeze and crack.

8. After finishing the experiment in Dongguan purification project, after the cleaning is finished, all electrical appliances should be turned off after people leave.