Introduction of various items of clean room engineering


Structure of the clean room:
In order to ensure the normal operation of the clean room, the structure must be strictly designed to prevent the amount of dust from any equipment anywhere in the clean room.

Dust-free purification workshop design plan:
The design of each detail must be reasonable, and the airflow conditions in the clean room must be carefully considered, as well as the installation position of each system. The space should be reduced without affecting the operation of the workshop. The building materials, walls and The floor should be selected to be non-dust-producing, non-sticky, and anti-static, because some clean clothes can generate static electricity during the work of staff.

Replacement of airflow:
It can also ensure the cleanliness of the room and prevent polluted air from entering the room from the outside. Proper fresh air must be added.

Auxiliary equipment:
In order to prevent cross-contamination between clean areas, equipment that meets cleanliness requirements, such as auxiliary equipment for transfer windows, should be installed.