Analyze the clean method of clean room | Dongguan Lixiang clean room | Dust free workshop equipment engineering


I. This operation process will guide and learn from the clean operation of the factory clean room

2. Required cleaning tools and products

(1) Special vacuum cleaner for clean room

(2), clean paper, dust-free cloth

(3) Deionized water

(4) Alcohol

(5) bucket

(6) Mop

(7) Mop bucket

3. Cleaning requirements

(1) Use clean room dust-free cloth when cleaning walls in clean rooms;

(2) Configure the detergent with 90% deionized water and 10% isopropyl alcohol;

(3) Use an approved clean room special detergent;

(4) Check the garbage bins in the workshop and the preparation room every day and remove them in time.

(5) Every floor must be vacuumed. At each shift, the work should be done on the map, such as where it ends and where it starts.

(6) Use a special mop to clean the floor of the clean room.

(7) Use a special vacuum cleaner with a high-efficiency filter for vacuuming in the clean room.

(8) All doors need to be inspected and wiped dry

(9) Wipe the ground after sucking it. Rub the wall once a week.

(10) Vacuum and wipe under the raised floor.

(11) Wipe the pillars and support pillars under the raised floor once every three months.

(12) When working, you must remember that you will always wipe from top to bottom, and wipe from the direction farthest from the door.

Four, clean room cleaning procedures

(1) Replace the special anti-static clothing, wear a hat and a mask, and then enter the clean room after removing dust through the air bath dust extraction channel.

(2) After cleaning tools and supplies have been prepared and placed in the prescribed place, cleaning work will begin.

(3) Pick up the ground garbage and proceed from inside to outside according to the order of the production line.

(4) Dump the garbage in the trash bin and bin on time and check it. After strict classification according to regulations, it will be transported to the designated garbage room for classification after inspection by the production line manager or security.

(5) Use clean paper or dust-free cloth from top to bottom to clean indoor glass, walls, shelves,

(6) Use clean dust to push the ground carefully and clean from the inside out. The ground is littered with dirt, stains, and water.

(7) Clean up the floor of the production line, under the working table, and under the chairs by using the rest time of the employees of the production line.

(8) Regularly clean the ceiling, air conditioner air outlet, ceiling light cover, under the raised floor, cleaning procedures and materials used must be approved by the factory affairs department, and use of holidays and work breaks as planned.

(9) The waxing of the clean room floor must be carried out in strict accordance with the plan and cleaning procedures. Antistatic wax must be used.

(10) After the cleaning work is completed, all cleaning supplies need to be received in the designated clean room, stored separately from ordinary tools, to avoid cross-contamination, neatly placed, and not to be randomly placed in the clean room.

Five, matters needing attention

(1) Loose hoods, face masks, beard hoods, shoe covers and latex gloves must be discarded and never used again.

(2) Requirements for staff dressing and preparation.

(3) No personal items are allowed, such as coats, hats, wallets, keys

(4) Employees should change clothes and accessories that cause pollution.

(5) Employees should wear clean room hoods, gloves, rabbit fur and socks. Broken or contaminated smocks or gowns should be replaced immediately. Dress should comply with the required dressing procedures.

(6) No ordinary paper pads, notebooks, manuals, and writing boards are allowed; ordinary writing pencils, pens, erasers, crayons or chalks are not allowed; note pads, plastic paper, and similar paper, Also use ballpoint pens or other non-dusting appliances; the blue line marks, specifications or other instructions should be covered with plastic film, cotton wool or other non-dusting appliances.

Related tags: Dongguan Cleanroom ︱Dongguan Purification Workshop︱Dongguan Purification Project︱Dongguan Cleanroom Project︱Clean Room Project︱Dustless Workshop Installation︱Dongguan Cleanroom Decoration︱Dongguan Purification Workshop Decoration︱Dongguan Lixiang Air Conditioning Purification Project Limited the company

Article source: http://jimesale.com Tan Yuming 13751461639

Business Consulting
WeChat public account
Mobile app