⎝⎛中国足彩app⎞⎠

Hello! Welcome to the website of Dongguan Lixiang Air Conditioning Purification Engineering Co., Ltd.!
share it

Project Category

Main project classification

Important Features of Decoration Construction in Dongguan Clean Room


Important features of interior decoration construction in Dongguan clean room:
1. The lifting floor has different requirements for the number of air changes according to the cleanliness level, and the coverage rate of the perforated plate is different. When installing the lifting floor, the column should be determined first.

For positioning, use a special glue to fix the column on the epoxy floor, and test its firmness after the glue is dry.
2. All pipelines inside the raised floor shall not be constructed before the installation of columns.
3. The ceiling needs to be a system specially designed for dust-free workshops, in order to facilitate easy and fast installation, strong, beautiful, dry and wet. Dry ceilings are used for

High-efficiency filter fan system, wet system for return air conditioning box with high-efficiency filter air outlet system.
4. The dust-free workshop wall is made of polystyrene colored steel sheet, which is easy to disassemble and assemble.
Dongguan Lixiang Air Conditioning and Purification Engineering Co., Ltd. was established in 2000. It is a professional company engaged in central air conditioning, energy saving and environmental protection air conditioning, constant temperature and humidity, air conditioning, ventilation and purification engineering, dust-free workshops, as well as water and electricity installation, stainless steel engineering. Support high-quality engineering design, installation and technical supervision teams.

Business Consulting
WeChat public account
Mobile app

⎝⎛中国足彩app⎞⎠