⎝⎛中国足彩app⎞⎠

Hello! Welcome to the website of Dongguan Lixiang Air Conditioning Purification Engineering Co., Ltd.!
share it

Project Category

Main project classification

The role and importance of air shower


Air shower standard configuration functions:


1. Cold plate spraying series, adopting multilayer pickling technology, electrostatic dust-free spraying treatment.


2. It adopts full-automatic control operation, double-door electronic interlocking, automatic blowing shower by induction, and double-door lock when blowing.


3. Using digital display shower time, the air shower time is adjustable from 0 to 99s, and the air shower time is displayed.


4. The stainless steel handle, thick stainless steel base plate and stainless steel nozzle are used as the basic configuration.

5. The wind speed of the supply air shower system designed with the new design concept can reach a super strong wind speed of 25m / s ~ 32m / s, ensuring that the personnel and goods entering the clean room achieve the perfect effect of complete dust removal.

http://jimesale.com/0769-85350459
Business Consulting
WeChat public account
Mobile app