Construction projects and requirements of Dongguan clean room


Dongguan clean room construction project:

1. Partition wall panels: Including windows and doors, the materials are color steel plates, but there are many types of cores for color steel plates.

2. Ceiling ceiling: Including suspenders, girder beams, ceiling lattice beams, the materials are generally: color steel plate and dust-free board.

3, lighting equipment: special dust-free lamps.

4. The production of dust-free workshops mainly includes ceilings, air-conditioning systems, partitions, floors, and lighting fixtures.

5. Floor: Elevated floor or anti-static PVC floor or epoxy floor.

6, air-conditioning system: including the host, air duct, filter system, FFU, etc.

Electrical engineering construction requirements:

1. Clean air-conditioning power distribution, lighting power distribution and other equipment power distribution should be controlled separately.

2. The power of the network cable and wall equipment uses the original line, and the distribution box, socket, lighting switch and network panel are concealed.

3. The clean room should provide sufficient lighting according to production requirements, and it should be reviewed before construction.

4. Each individual area lighting switch should be controlled separately.

5. Lighting installation should be easy to clean.

6. After the indoor clean lamps are installed, they should be cleaned in time.